Commercial Solar Projects Malaysia
Inhome Solar installs rooftop solar PV for Malaysian businesses: retail, hospitality, workshops, factories and other commercial roofs. The gallery below is photography of completed sites. System sizes and savings are published only when verified.





_wfsBiU6NvY.jpg?updatedAt=1741619313674)


_2lLQfCJaa.jpg?updatedAt=1741619313564)

_iMvrbA05L.jpg?updatedAt=1741619313241)

Commercial solar for Malaysian businesses
Commercial rooftop solar suits factories, warehouses, retail, offices, F&B and industrial buildings with a dedicated TNB account and a structurally sound roof. Inhome Solar photographs on this page include named sites below. System kWp, generation and savings are listed only when verified — they are not invented for this gallery.
Installation process
- Bill and roof review
Review bills or Maximum Demand records and inspect the roof, structure and electrical board.
- System design
Design kWp, inverter layout and cable routes against Solar ATAP non-domestic limits.
- Documentation
Prepare SEDA Malaysia and TNB documentation. Network studies may apply on larger systems.
- Install and handover
Install, test, commission and hand over monitoring once utility metering is complete.
Photographed commercial sites
- Redwood Pharmacy, Kuchai
Kuchai, Kuala Lumpur — Retail rooftop solar photographed for the commercial gallery.
- Momento Puchong
Puchong, Selangor — Commercial rooftop solar photographed in Puchong.
- Suwara Hotel, Kepong
Kepong, Kuala Lumpur — Hospitality rooftop solar photographed at Suwara Hotel, Kepong.
- Factory, Taman Maluri Kepong
Kepong, Kuala Lumpur — Industrial rooftop solar photographed at a factory in Taman Maluri, Kepong.
- V Best Auto, Petaling Jaya
Petaling Jaya, Selangor — Automotive workshop rooftop solar photographed in Petaling Jaya.
Financing and ROI depend on tariff, load profile and equipment. We do not publish a guaranteed commercial payback on this page.
Common questions
Can I export excess solar electricity?
Eligible Solar ATAP consumers can export surplus energy to TNB within programme limits. Domestic credits use the Energy Charge component; non-domestic credits use Average SMP. Excess above imported energy or MAQ in that billing period is forfeited.
How long does installation take?
Physical installation on a typical landed home is often measured in days once materials are on site. Solar ATAP application, TNB documentation and metering can add weeks around that work. Timelines vary with authority processing and site complexity.
What is Solar ATAP?
Solar ATAP is the Solar Accelerated Transition Action Programme for Peninsular Malaysia. It replaced Net Energy Metering as the current consumer rooftop programme from 1 January 2026. Homes and businesses use solar first for their own load and may receive bill credits for eligible exported energy in the same billing period.
Which commercial buildings are shown here?
Named sites on this gallery come from the photography filenames: Redwood Pharmacy Kuchai, Momento Puchong, Suwara Hotel Kepong, V Best Auto Petaling Jaya, and a factory in Taman Maluri, Kepong.